Brief description
The study carried out by GEOS Ingénieurs Conseils is part of the underground radioactive waste disposal project.
The technical characteristics of the project are as follows: construction of 2 x 4 km descent tunnels, 4 x 550 m shafts and 200 km of underground storage galleries and cells at a depth of 500 m in the Callovo-Oxfordian clay.
The minimum operating life is 100 years.
Mission
GEOS is carrying out the following tasks:
- System project management: design studies for the civil engineering of the underground structures;
- Assistance to the project owner for the APS and APD phases.
- Project owner : ANDRA
- Mission : Etudes d’esquisse, AMO des phases APS et APD
- Mission date : 2012-2017


